Walk - Run - Fly

Welcome to the Walk Run Fly Blog! This site will be updated often so that all the members of LWC can see the progress of each phase.

Monday, June 9, 2008

Delivery Door Into The Kitchen


The concrete for the stairs and walkway have been poured.

Kitchen Bathrooms Storage



The three rooms that have been added onto the Fellowship Hall are now framed in.

Stage side of the Fellowship Hall


In the center of the room is a desk/sound booth that was made by Lou Riddle. Thanks again Lou!